24 to 36 monthsIllustrative imageCasagrand Highcity
ORR, Chennai
₹58 L onwards
- Homes
- 2 and 3 BHK apartments
- Campus
- 41 acres, 4,000+ homes
- Handover
- 24 to 36 months
- TNRERA
- TNRERA/01/BLG/0156/2026
Casagrand Highcity is a 41-acre township on the Outer Ring Road near Mudichur. See its prices and homes, and what the area offers today and what is still to come.
Last updated 21 September 2026
A residential, lake-side belt on the south-west ring road, where the main appeal is price and space rather than an established local market.
The Chennai Outer Ring Road is a 62 km bypass around the city. It meets the GST Road at Vandalur and Perungalathur at its southern end and runs north-west to Nazarethpettai, Nemilichery and Minjur. Both phases are open: the first, of 29.65 km, opened in August 2014, and the second, of 33.1 km, was inaugurated in February 2021. It is maintained by the Tamil Nadu Road Development Company.
The stretch covered here passes the residential belt of Mudichur, Varadharajapuram and Mannivakkam, west of Tambaram, in Kundrathur taluk, with Kundrathur further north. It is mainly a residential and lake-side area rather than an established employment or retail hub, so everyday schools, hospitals and shops are mostly found in Tambaram, Kundrathur and Pallavaram.
Casagrand Highcity is the developer's project here: four towers of up to B1+B2+G+22 floors and more than 4,000 homes on 41 acres. That scale is what lets a township bring a school and a 6-acre sports hub inside its own gates. The sections below cover the project, how the area connects, what public projects are planned and what to check, including the area's flood history.
One township, and the largest Casagrand campus in this part of the city. The card shows the headline numbers, and the details section below has every home type.
24 to 36 monthsIllustrative imageORR, Chennai
₹58 L onwards
Highcity is a 41-acre township of four towers and more than 4,000 homes. Casagrand lists 150+ amenities, a 21,000 sq ft resort-style swimming pool, a 57,000 sq ft G+2 clubhouse and a 6-acre sports and recreation hub with 35+ courts, and it lists Casagrand International School at 0 km.
Prices and sizes are as published by Casagrand on 21 September 2026. Ask for a written cost sheet for the exact home.
Sizes, starting prices, structure, RERA number and the landmarks Casagrand lists around the project.
The developer lists 4,000+ homes across four towers, so ask which tower and phase your home belongs to.
| Home type | Size | Price |
|---|---|---|
| 2 BHK | 1,109 sq ft | ₹58 L onwards |
| 3 BHK | 1,291 to 1,636 sq ft | ₹67 L to ₹81 L |
Starting prices as published on 21 September 2026. They exclude GST, stamp duty, registration and other charges.
Distances and times are the developer's figures, not measured by us.
The ring road itself is the main asset. Rail and bus connections are on the GST Road side.
| Mode | What serves the area | What to know |
|---|---|---|
| Road | Outer Ring Road (Vandalur to Minjur, 62 km) | Connects the GST Road at Perungalathur and Vandalur, NH 48 at Nazarethpettai, CTH Road at Nemilichery and the Ennore side at Minjur. CMDA describes six lanes plus two service lanes, with a 22 m central strip reserved for a possible mass rapid transit or light rail system. It is a tolled road, and we did not verify current rates. |
| Road | Varadharajapuram and the Sriperumbudur state highway | Varadharajapuram lies between Mudichur and Mannivakkam, about 6.5 km from Tambaram, along the Sriperumbudur state highway. |
| Road | GST Road at Vandalur and Kilambakkam | The GST Road carries about 1.5 lakh vehicles a day and already has grade separators between Perungalathur and Vandalur. The Kilambakkam bus terminus and the new Kilambakkam station are just south of Vandalur. |
| Bus | Kalaignar Centenary Bus Terminus, Kilambakkam | Opened in December 2023 on 88.52 acres with 215 bus bays. There has been public concern about last-mile connectivity. |
| Suburban rail | Vandalur, Perungalathur and the new Kilambakkam station | These are on the Chennai Beach to Chengalpattu line. No suburban station sits directly on the ring road at Mudichur or Mannivakkam. The Kilambakkam halt station was due to open by the end of June 2026, and we could not confirm that it has. |
| Airport | Chennai International Airport | Casagrand lists it at 12 km from Highcity and Vandaloor Zoo at 12.4 km. These are the developer's figures, so time the drive yourself. |
Metro status. No Chennai Metro line runs on the Outer Ring Road. The airport to Kilambakkam extension has been proposed via Pallavaram, Tambaram and Vandalur, and reports conflict on whether the Union government has approved it, so treat it as not yet cleared for construction.
This stretch has less local infrastructure than the established suburbs, and we have kept that visible. Here is what is sourced.
The ring road is built. What is planned around it is mainly rail, metro and the GST Road.
| Project | Status | What to know |
|---|---|---|
| Outer Ring Road, both phases | Open | Phase 1 opened on 29 August 2014 and Phase 2 on 9 February 2021, so the full 62 km is in operation. |
| Airport to Kilambakkam metro extension | Planned, approval disputed | On 28 May 2026 DT Next said the report was still awaiting the Ministry of Housing and Urban Affairs. Two other outlets reported central approval in May 2026. |
| Kilambakkam to Chengalpattu metro report | Planned | CMRL floated a tender in July 2026 to prepare a project report, and plans to seek central approval afterwards. |
| Kilambakkam railway station and skywalk | Under construction | Target of the end of June 2026 after earlier slips. Opening not confirmed. |
| Tambaram to Chengalpattu fourth railway line | Approved | About 30 km at about ₹757 crore, with a link to the Kilambakkam terminus. Work was reported as about to begin. |
| GST Road elevated corridor, Kilambakkam to Mahindra World City | Planned | About 18 km and six lanes at a reported ₹2,950 crore. A construction start was not confirmed. |
| Adyar river widening, Thiruneermalai to Anagaputhur | Reported under way in 2023 | A 2.5 km stretch widened from under 100 ft to 360 ft at about ₹70 crore, aimed at flood relief upstream of Mudichur. We could not verify completion or its effect. |
Opening dates for public projects are targets and have moved before. Treat them as indications and check the agency's current announcement. Status as reported up to 21 September 2026.
A fair look at what draws buyers here and what to weigh against it.
The flood record comes first here.
A November 2021 report describes water up to 6 feet in Mudichur, with causes cited as Chembarambakkam lake releases, Adyar overflow, encroachment of the Adyar flood plain and poor desilting, and a resident called it a recurring problem since 2015. In December 2023 overflow from Manimangalam Lake, Vandalur Periya Eri and Mudichur Periya Eri affected Varadarajapuram and neighbouring layouts. On 1 December 2024, during Cyclone Fengal, water entered homes in Varadarajapuram, Mudichur and neighbouring layouts, and residents cited weak drainage and planning around the ring road construction. Ask for the site's ground level and drainage design, check the Water Resources Department lake and river data, and speak to people who live nearby.
Copy the number from the project card, TNRERA/01/BLG/0156/2026, and search it on the Tamil Nadu RERA website. Confirm which phase and tower it covers, and the registered completion date.
The ring road is tolled and we did not verify rates. Drive to your workplace and to the nearest station at your own hour, and add the toll to your monthly costs.
Visit the surroundings: roads, drains, water supply and the nearest hospital and shops. Ask which facilities inside the township are already open.
Ask for a written cost sheet with the base price, GST, stamp duty, registration, maintenance deposit and parking, and tie each payment to a construction stage.
This is general information, not legal or financial advice.
Neighbourhoods around the ring road that have their own page.
Projects in Kundrathur and East Tambaram, if you want to compare more than one area.
12 to 24 monthsIllustrative imageKundrathur, Chennai
₹76 L onwards
24 to 36 monthsKundrathur, Chennai
₹67 L onwards
24 to 36 monthsIllustrative imageEast Tambaram, Chennai
₹61 L onwards
East, on the GST Road
The nearest established suburb, with a major rail terminal, colleges and hospitals, and Casagrand projects at Estia, Primrose, Aria and Mabelle.
North, off the Pallavaram to Kundrathur road
Casagrand Massimo and Highclere are in Kundrathur, 5 km from Highcity as Casagrand lists it.
North-east, towards the airport
Casagrand Reva, Casamia and Madelyn are in Pallavaram and Chromepet.
North-west, along the ring road
Listed by Casagrand as an area served by Highcity, Massimo and Linore.
Tell us the home size and budget you are considering and when you would like to move in. We will reply with the current price sheet and can arrange a visit.
Fill in the form and we will reply with current price sheets and a shortlist.
Casagrand Highcity is the project listed on the Outer Ring Road. It is a 41-acre township of four towers of up to B1+B2+G+22 floors, with more than 4,000 homes.
A 2 BHK of 1,109 sq ft starts at ₹58 lakh, and a 3 BHK of 1,291 to 1,636 sq ft is ₹67 lakh to ₹81 lakh. Casagrand lists a base rate of ₹4,099 per sq ft. Prices as published on 21 September 2026, before GST and other charges.
Casagrand lists Kundrathur at 5 km, Tambaram at 7 km, Pallavaram at 9 km and the airport at 12 km. These are the developer's figures, so time the drive yourself.
Casagrand lists Casagrand International School at 0 km from the township. Ask which classes it runs and whether it is open now.
The Mudichur and Varadharajapuram belt has flooded repeatedly, including in 2021, 2023 and December 2024. Ask about the site's ground level and drainage, check lake and river data and speak to nearby residents.
No. The airport to Kilambakkam extension has been proposed via Pallavaram, Tambaram and Vandalur, and reports conflict on whether the Union government has approved it. The ring road has a strip reserved for a possible mass rapid transit system.
Casagrand lists 24 to 36 months for Highcity. Check the completion date on its TNRERA registration, TNRERA/01/BLG/0156/2026.
Every Casagrand apartment project in Chennai, by budget, area and building height.
Compact and mid-size homes from ₹50 lakh, compared by size, price and area.
Family-size homes from ₹64 lakh to above ₹5 crore, compared by size, price and area.
Large integrated communities, compared by acres, density and amenities.
Casagrand projects by area, from OMR to Porur to north Chennai.